SAVE WILLIAMSTOWN

NEW APPLICATIONS August 2017

72 High-Rise Apartments & 15 Dwellings

brings Total to over 330 Dwellings

 

Location of Lot 8 and Lot 4 Applications

The diagram above shows the 300m Worksafe Planning Advisory Area superimposed on the Developers Graphic for the whole site.  The 400m arc shows where a Boilover or BLEVE from the Mobil Tank Farm could impact on the site - a rule of thumb which Mobil would adopt for people safety.


Lot 8 and Lot 4 are the current applications.  Both are impacted by SAFETY issues.  The pink and turquoise buildings are being built in 2017 from VCAT approvals in 2013 to 2015.


The diagram below shows relevant distances from the Mobil tanks on a Google Map